X

Why Is Dry Plastering Becoming Less Profitable? 90% of Construction Professionals Are Falling into These Pitfalls!

2026-03-13 13:20:13

420aba08-d1c0-4a3e-ad8b-cb58ce1365fe.png


Anyone involved in construction knows that wall plastering is—and always has been—a particularly thorny challenge within any project:

1. Hiring skilled workers is a costly affair; a daily wage of 400 to 500 yuan is the bare minimum required to secure their services. With labor

 costs rising year after year, already razor-thin profit margins are being squeezed even further.

2. In manual plastering, the absolute maximum output for a single worker is typically around 100 to 110 square meters per day. On projects 

with tight deadlines, even working overtime and double shifts often isn't enough to keep pace with the schedule, leaving the contractor to

 bear the full brunt of the pressure—from client demands for payment to penalties for project delays.

3. Even more concerning is the inconsistency in workmanship: uneven surfaces, hollow spots, and cracks are all too common. Any required

 rework turns the job into a financial loss; not only does it wipe out potential earnings, but it also drags down the overall project timeline 

and eats away at the remaining profit margin.


eb282c1c-d868-4941-a42f-01a38efa6b11.png


Today, we introduce to all project owners, general contractors, renovation firms, and labor teams a true game-changer: the Deruitu Intelligent Plastering

 Machine—a plastering marvel that is truly practical, profitable, and built to withstand the rigorous demands of any construction site.


What enables the Deruitu plastering machine to revolutionize traditional plastering?

Efficiency That Crushes Manual Labor: 1 Machine Does the Work of 8 Skilled Workers

1f66ad25-c4f1-4876-9ede-ae3c037cd0e9.jpg


With traditional manual plastering, a team of eight skilled workers can cover a maximum of 800 square meters per day; in contrast, the Deruitu 

intelligent plastering machine—a single unit—can complete 80 to 120 square meters of plastering per hour, achieving a daily output exceeding

 800 square meters. This represents a direct tenfold increase in efficiency. By drastically shortening the construction cycle, the system not only 

saves substantial labor costs but also enables early project completion and accelerated payment collection, thereby significantly boosting

 the efficiency of project capital turnover.


Precision Meets Acceptance Standards: Zero Hollow Spots, No Rework Required.

0d7cfb0f-ee3e-4c22-bef1-ec63be9fecc1.jpg

The Deruitu plastering machine is equipped with an intelligent verticality sensor, enabling fully automated, precise leveling. It keeps wall verticality 

errors within 2 mm—far exceeding standard construction acceptance criteria. This ensures first-time acceptance, allowing you to permanently

 eliminate the risks of costly rework and financial loss.


Easy to Operate — On-site Installation Guidance Provided by Engineers


8dfbfff2-4577-496c-b765-3dcfcc54adab.jpg

The Deruitu plastering machine is simple and easy to operate; combined with on-site installation guidance provided by our engineers, even an 

unskilled laborer can master its independent operation within just two hours. This significantly lowers both the barrier to entry for workers and

 overall labor costs, making project management much easier.


Adapts to Any Scenario: One Machine Handles All Your Plastering Needs


314e4787-1fc4-4daa-8679-0377b9d5be0a.jpg

Whether for interior or exterior walls—be it commercial housing, resettlement housing, industrial plants, villas, or renovation projects—the Deruitu 

plastering machine adapts perfectly to every scenario, giving construction professionals complete peace of mind.


Inquire Now to Claim Exclusive Benefits for Engineering Professionals

In the construction industry, efficiency translates directly into profit, and reputation is the very lifeline of the business. 

For identical projects, while others rely on manual labor to earn hard-won wages, you can utilize the Deruitu plastering

 machine to save on labor costs, boost efficiency, and eliminate the need for rework—thereby earning pure profit. 

Furthermore, by delivering faster project completion times and ensuring consistently high quality, you can secure even more high-value contracts.


If you are currently grappling with challenges regarding labor, efficiency, 

or quality in your plastering operations—and are looking to reducecosts while boosting productivity—send us a private message right now to claim your exclusive benefits!

image[1].png